Dong Run Feng Hua

Tanhua'an Road

Basic Information

District
Jianggan
Circle
Jingfang
Year Built
2011
Total Buildings
8
Total Units
613
Parking Spaces
382
Property Management
Green Castle Property Service Group Hangzhou First Branch Company
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Dawn Flower Hermitage Metro Station Exit C Line 6 696 m ≈ 8min
Tan Hua An Road Metro Station Exit D Line 6 703 m ≈ 8min
Dahua An Road Station Line 6 787 m ≈ 9min
Dahua An Lu Metro Station Exit A Line 6 799 m ≈ 9min
Xin Tang Metro Station Exit C Line 4 851 m ≈ 10min
Dan Hua An Lu Station Exit B Line 6 865 m ≈ 10min
Xin Tang Metro Station Exit B Line 4 900 m ≈ 11min
Xin Tang Station Line 4 914 m ≈ 11min
Xintang Metro Station Exit A1 Line 4 938 m ≈ 11min
Xin Tang Metro Station Entrance Line 4 939 m ≈ 11min
Jing Fang Metro Station Exit A Line 4 984 m ≈ 12min
Xin Tang Metro Station Exit A2 Line 4 1016 m ≈ 12min
Jing Fang Metro Station Exit B Line 4 1033 m ≈ 12min
Jing Fang Metro Station Exit C Line 4 1125 m ≈ 14min
Jing Fang Metro Station Exit D1 Line 4 1139 m ≈ 14min
Jing Fang Station Under Construction Line 15;Line 4 1160 m ≈ 14min
Jing Fang Metro Station Exit D2 Line 4 1206 m ≈ 15min
San Bao Metro Station Exit C Line 9 1227 m ≈ 15min
Jing Fang Metro Station Exit D3 Line 4 1233 m ≈ 15min
San Bao Metro Station Exit B2 Line 9 1249 m ≈ 15min

Available Properties